REFERÊNCIAS BIBLIOGRÁFICAS
ADELSBERGER, H.H. et alii., "Rule based object-oriented simulation
systems", Intelligent Simulation Systems, SCS, Simulation Series, 107-112,
Jan, 1986.
ADELSBERGER, H.H. e NEUMANN, G., "Goal oriented simulation modeling
using PROLOG", Proc. of the 1985 SCS Conf. on Modeling. and Simulation
On MicroComputers, San Diego, Cal, 42-47, 1985
AMADOR, R.M.S.T. e PIMENTÃO, J.P.B., "Representação
de conhecimento através de "frames", Univ. Nova Lisboa,
Dep. Informática, Portugal, 1988
ARBEL, A. e SEIDMANN, A. " Performance Evaluation of FMS ". IEEE
Transactions on Systems, Man and Cybernetics, July-August, 1984, pp. 606-617.
AZZONE, G. e BERTELÈ, U., "Measuring the economic effectiveness
of flexible automation: a new approach", International Journal of Production
Research., v. 27, 5, 735-746, 1989.
BANKS. J. e ARSON, J.S. Discrete-Event System Simulation. Prendice-Hall,
Englewood Cliffs, NJ, 1984.
BARAD, M. e SIPPER, D., "Flexibility in manufacturing systems definitions
and Petri net modeling", International Journal of Production Research,
26, 237-248, 1988.
BENJAAFAR, S., "Intelligent Simulation for Flexible Manufacturing Systems..
an Integrated Approach., Computers and Industrial Engineering, V.22, Nº
3, 297-311, 1992.
BEVANS, J.P., "First chose an FMS simulator", American Machinist,
126, May, 143145, 1982.
BOZER, Y.A., "Guided Vehicle Systems: Information/Control system implications
of alternative design and operation strategies", In: Advanced Information
Technologies for Industrial Material Flow Systems, Ed. S.Y. Nof and C.L.
Moodie, 1989.
BRILL, P.H. e N1ANDELBAUM. M.,"On measures of flexibility in manufacturing
systems", International Journal of Production Research, 27, 747-756,
1989
BROWNE, J. et alii., "The development of a FMS design procedure",
in Proceedings of the First ORSA/TIMS Special Interest Conference on FMS,
K. Steeke & R. Suri (ed.), Ann Harbor, Michigan, 1984.
BUZACOTT, J.A., "The fundamental principles of flexibility 'm manufacturing
systems Proc. of the First Int. Conf., Brighton UK, Elsevier, Amsterdam,
1982
BUZACOTT, J.A. e MANDELBAUN, M., "Flexibility and Productivity in
manufacturing systems", in Proc. of the IIE Conf., Chiago,
IL., Ind. Eng. Man. Press, 404-413, 1985
BUZACOTT, J.A. e SHANTICUMAR, J.A.,"Models for understanding FMS, AIIE
Transactions, 12, 339-349, 1986.
BUZACOTT, J.A. e YAO, D.D., "FMS a review of analitical Models",
Management Science, 32, 890-904, 1986.
CARLIER, J. , "Simulation as planning tool for an FMS", in Proc.
of 4th International Conference of Simulation -m Manufacturing, 231-238,
1988.
CARRIE, A., "The role of simulation in FMS", 'M: A. Kuslak
(ed.), Flexible Manufacturing Systems: Methods and Studies. Norht-Holland,
Amsterdam, 191208, 1986.
CARRIE, A., Simulation of Manufacturing Systems. John Wiley & Sons Ltd..
1988, London.
CARRIE, A.S. e PETSOPOULOS, A.C.,"Operation Sequencing in a FMS",
Robotica, 3, 259-264, 1985.
CHATTERJEE, A. et alii., "Manufacturing Flexibility: Models and measurements".
in Proc. of the First ORSA/TIMS Special Interest Conf. 'M FMS, K.E. STECKE
e R. SURI (ed.),Ann Arbor, Mich., Elsevier, Ams., 1984.
CHANDRA, J. e SCHALL, S.O. "Economic Justification of FMS's using the
Leontief input-output model". The Engineering Economist. Vol.34, N:
01, 1988.
CHEN, C.S. e SARIN, S.C., "A mathematical model for manufacturing system
selection, in: A.Kuslak (ed.), Flexible Manufacturing Systems: Methods and
Studies. Norht-Holland, Amsterdam, 03-25, 1986.
CHENG, T.C.E., "Simulation of Flexible Manufacturing Systems".
Simulation, 45. Dec.. 299-302, 1985.
CHORAFAS, D. N., Knowledge Engineering., Van Nostrand Reinhold Edition,
New York, 1990.
CHRISTY, D.P. e WATSON, H.J., "The application of simulation: A survey
of a mdustry practice", Interfaces, 13, Oct, 47-55, 1983.
COSTA, R.S. e JARDIM, E.G.M. " Simulação no Gerenciamento
da Produção. "Informativo do INT, pg. 13-24, v. 17, 34,
jul/dez. 1985.
CO, H.C., JAW, T.J., Sequencing in manufacturing systems and other
short queue length systems, Journal of Manufacturing Systems, 7, 1-9, 1988
CUNHA, C.J.C.A. " Produção e estratégia ".
Anais do IX ENEGEP. Porto Alegre, Set, 1989.
CUNHA, C.J.C.A. "Aspectos estratégicos do CIM". Anais o
IX ENEGEP. Porto Alegre, Set. 1989.
CZIULIK, C. e ROSA, E. "O CIM como elemento do planejamento estratégico
das organizações". Anais do VIII ENEGEP. São Paulo,
1988.
DUBOIS, D. e STECKE, K. E., "Using Petri nets to represent production
processes, Proc. 22nd IEEE Conference 'M control, 1983.
EGBELU, P.J., e TANCHOCO, J.M.A.. "Characterization of the automatic
guided vehicle dispaching rules, International Journal of Production Research,
22, 359374, 1984.
EGBELU, P. J., "Establishment of economic-c production rate, production
batch size and production sequence m manufacturing systems with flexible
routing". European Journal of Operational Research, 67, 358-372, 1993.
ELMARAGHY, H.A. e HO, N.C., "A flexible system for computer control
of manufacturing", Computer in Mechanical Engineering., 1, 53-63,
1982
ERKES, K. e SCHMIDT, H. "Flexible Fertigung". VDI- Zeitschrift,
pg. 577-591, 1987.
FIKES, R. e KEHLER,T.,"The role of frame-based representation in reasoning",
Commun. of the ACM, v 28, 9, 904-920, 1985.
FISCHLER, M.A. e FIRSCHEIN, 0., Intelligence - The Eye, the Bram, and the
Computer, Addison-Wesley, 1987.
FREITAS, P.J., "Uso de sistemas inteligentes de simulação
no gerenciamento de sistemas flexíveis de manufatura", Anais
do X ENEGEP, Belo Horizonte, 1990.
FUTO, M.S. e SZEREDI, J., "A discrete simulation system based on artificial
intelligence methods", In Discrete Simulation and Related Fields, A.JAVOR
(ed), North-Holland, 135-150 1982
GAINES, BR. e SHAW, M.L.G.,"Expert systems and Simulation", 'M
Proc. of the Conf. on Artif. Intell., Graphics and Simulation, G. BIRTWISTLE
(ed.), San Diego, Cal., 95-101, 1985.
GARRET, S.E., "Strategy first: a case in FMS Justification",
'M Proc.of the second ORSA/TIMS Conf. on FMS, Ann Arbor, Mich., K.E. STECKE
e R.SURI (ed.), Elsevier, Amsterdam, 17-30, 1986.
GERWIN, D. "Do's and don'ts of computerized manufacturing". Harvard
Business Review, pg. 107-116, 1982
GERWIN, D. e TARONDEAU, J.C., "Intemacional comparisions of manufacturing
flexibility", In Mananging International Manufacturing, K.FERDOWS
(ed), Elsvier, Amsterdam, 169-185, 1989.
GOLDHAR, J. e JELINEK, M. " Plan for Economies of Scope ". Harvard
Business Review, 61(6), 1983, pp. 141-148.
GREENWOOD, N. R. Implementing Flexible Manufacturing Systems. 1988. John
Wiley & Sons, Inc., New York.
GROOVER, M.P. Automation, Production Systems and Computer Aided Manufacturing.
Prendice-Hall, Inc. Englewood Cliffs, New Jersey, 1980.
GUPTA, Y.P. e GOYAL, S. " Flexibility of Manufacturing Systems: Concepts
and Measurements ". European Journal of Operational Research, 43, pp.
119-135, 1989.
GUPTA, Y.P. e GOYAL, S. " Flexibility trade-offs in a randon FMS: A
simulation study. International Journal of Production Research. V-30, N'
3, March, 527-557, 1992.
HARMON, P. e KING, D., Sistemas Especialistas, Ed. Campus, 1988
HAYES, R.H. e JAYCUMAR, R. " Manufacturing's Crisis: New tecnologies,
Obsolete Organizations", Harvard Business Review, 66(5), 77-85, 1988.
RAYES-ROTH, F. et alli Bulding Expert Systems. Addison-Wesley Publishing
Co.
HAYES, R. H. e WHEELWRIGHT, S. C. " Dinâmica dos Ciclos de Vida
Processo-Produto ".Biblioteca Harvard de Administração
de Empresas. n. 4, vol. 8. Ed. Abril.
HAYES, R.H. e WHEELWRIGHT, S.C. Restoring our Competitive Edge. New York,
J. Wiley, 1984.
HENRIKSEN, J.O., "The integrated simulation enviroment (Simulation
software of the 1990s)", Operations Research, 3 1, Nov-Dec, 1053-1073,
1983.
HILL, T., Manufacturing Strategy - The Strategic Management of the Manufacturing
Function, Macmillan Education LTD, London, 1985.
HO, Y. C., "A survey of the discrete event dynamic systems", Annals
of Operations Research, 3, 1985.
HURRION, R. D., "Intelligent Visual Interactive Modelling", European
Journal of Operational Research, 54, 349-356, 1991.
INTELLICORP, KAPPA-PC 2.0 User's Manual, Melo Park, Cal, 1992.
INTELLICORP, KEE, User's Manual, Melo Park, Cal, 1985.
JAIKUMAR R., "Flexible Manufacturing Systems : A managerial perspective".
Wp #I784-078, Harvard Business School, Boston, Mass., Jan, 1984
KAPLAN, R. S. " Must CIM be Justified by Faith Alone? ". Harvard
Business Review, 64(2), 1986, pp. 87-95.
KIRAN, A. S. et alli, "An integrated simulation approach to design
of flexible manufacturing systems", Simulation, Feb., 47-52, 1989.
KLAHR, P., et alii., "Rule oriented Simulation", Proc. of the
1980 International Conference on Cibernetics and Society, IEEE, Cambridge,
Mass., Oct., 350-354, 1980.
KUSIAK, A., "Flexible Manufacturing Systems: A structural approach",
International Journal of Production Research, 23, 1057-1073, 1985.
KUSIAK, A. e CHEN, M., "Expert systems for planning and scheduling
manufacturing systems", European Journal of Operational Research, 34,
113-130, 1988.
LAW, A.M. e KELTON, W.D. Simulation Modeling and Analysis. McGraw-Hill,
NY, 1991.
LAW, A.M. " Introduction to Simulation: A Powerful Tool for Analyzing
Complex Manufactoring Systens". Industrial Engineering, pg 46-62, Maio
1986.
LEUNG, L. C., MAHESHWARI, S. K. e MILLER, W. A., "Concurrent part routing
and tool allocation 'M FMS FMS with material handling considerations",
Working Paper, Department of Industrial and Management Systems Engineering,
U.S.F., Tampa, USA, 1990.
LEUNG, L. C. e TANCHOCO, J. M. A. , "Multiple machine replacement within
an integrated firamework, The Engineering Economist, 32, 89 - 114, 1987.
MAHESHWARI, S. K. , "Planning and Operational control of FMS with material
handling considerations", Ph.D. Dissertation, Department of Industrial
and Management Systems Engineering, U.S.F., Tampa, USA, 1992.
MARTIN, D.L. e MUSSELMAN, K.J., "Simulation in the life clcle of FMS",
in Proceedings of the First ORSA/TIMS Special Conference on FMS, K.E. STECKE
& R. SURI (ed.), Ann Arbor, Mich., 154-167, 1984.
MEDEIROS, D.J. e SADOWSKI, R.P., "Simulation of robotic manufacturing
cells:a modular approch", Simulation,40,03-12, 1983
MISHRA, P. K. et alli, "Simulation studies of flexible manufacturing
systems", in Proceedgs of 4th International Conference of Simulation
in Manufacturing, 119-128,1988.
MONTAZERI, M. e VAN WASSENHOVE, L.N., "Analysis of scheduling rules
for FMS", Int. J. of Prod. Res., 28,785-802, 1990.
NOF, S. Y., BARASH, M., SOLBERG, J.J., "Operational control of item
flow in versatile manufacturing systems", International Journal
of Production Research, 17, 479-489, 1979.
NELSON,C.A. "A scoring model for FMS project selection". European
Journal of Operational Research, N: 24, 1986.
O'KEEFE, R., "Simulation and Expert Systems - A taxonomy and some examples",
Simulation, 46, Jan, 10-16, 1986
PENGDEN, C.D. et alii., Introduction to Simulation Using SIMAN, McGraw-Hill,
New Jersey, 1990
PRIMROSE, P.L., e LEONARD, R.," Establish the viability of FMS",
The FMS Magazine, 3, 114-116, 1985.
RACHAMADUGU, R.V. e STECKE, K.E., "Classification and Review of FMS
Scheduling Procedures", Working Paper, Graduate School of Business
Administration, The University of Michigam, Ann Arbor, 1989.
RADHARAMANAN, R. "Flexible Manufacturing Systems and Factories of the
Future". Seminário de Automação Industrial, UFRGS,
Set. 1989
RAMAN, N. et alii., "Real time scheduling of automated manufacturing
center", European Journal of Operational Research, 40, 222-224, 1989
SABUNCUOGLU, 1. e HOMMERTZHEIM, D.L. "Computer usage in manufacturing
systems". Computers and Industrial Engineering. Vol. 15, No 1-4, pg.
1-7 1988.
SABUNCUOGLU, 1. e HOMMERTZHEIM, D.L. " Experimental investigation of
FMS machine and AGV scheduling rules against the mean flow-time criterion".
European Journal of Operational Research, V-30, no 7, 1617-1635, 1992.
SCHRIBER, T.J. e STECKE, K.E., "Machine utilizations achieved using
balanced FMS production ratios 'M a simulation setting, Annals of Productions
Research, 32, 579-595, 1988.
SCHROER, B.J.e TSENG, F.T., "Modelling Complex manufacturing Systems
UsingDiscret Event Simulation", Computers and Industrial Engineering.,
Vol 14, 4, pg 455-464, 1988.
SCOTT, A. C. et alii, A Practical Guide to Knowledge Acquisition.. Addison-Wesley
Company, Inc. USA, 1991.
SETHI, A.K. e SETHI, S.P., "Flexibility in Manufacturing: a survey",
The International Journal of FMS, 2, 289-328, 1990.
SHANNON, R.E., "Knowledge based simulation techniques for manufacturing",
International Journal of Production Research, 3, 953-973, 1988.
SHANNON, R.E. et alli " Expert system and simulation". Simulation,
pg.275-284, jun. 1985.
SKINNER,W. Manufacturing: The Formidable Competitive Weapon, New York, J.
Wiley, 1985.
SOLBERG, J.J.,"Optimal design and control of computerized manufacturing
systems", Proc. of AIIE Systems Eng. Conference, Boston, 137-147, 1976.
SOLBERG, J.J.,"CAN-Q User's guide", Purdue University, School
of IE, 1980.
SON, Y.K. e PARK, C.S. "An economic avaluafion model for advanced manufacturing
systems". The Engineering Economist. Vol. 34, 1, 1988.
STECKE, K.E., "Design, planning, scheduling and control problems of
FMS", Annals of Operations. Research, 3, 51-60,-1985.
STECKE, K.E., "A hierarchical aproach to solving machining grouping
and loading problems of FMS", European Journal of Operational Research.,
24, 369-378, 1986.
STECKE, K.E. e SOLBERG, J.J., "Loading and control polices for FMS",
International Journal of Production Research, 19, 481-490, 198 1.
SLACK, N., "The flexibility of Manufacturing systems", International
Journal of Operational and Production Management, V.7, 4, 35-45, 1987
SURI, R., "An overview of evaluative models for Flexible Manufacturing
Systems", Annals of Operations Research, 3, 61-69, 1985.
SURI, R. e DILLE, J. W., "A technique for on-line sensitivity analysis
of flexible manufacturing systems", Annals of Operations Research,
3, 1985.
SURI, R. e HILDEBRANT, R. R. , "Modeling Flexible Manufacturing Systems
using mean value analysis", Journal of Manufacturing Systems, 3, 27,
1984
SURI, R. e WYHITNEY, C., " Decision support requirements in flexible
manufacturing", Journal of Manufacturing Systems, 3, 185-193, 1984.
SWAMIDASS, P.M. e NEWELL, W.T. "Manufacturing Strategy, Enviornmental
Uncertanty and Performance: A Path Analytic Model ". Management Science
33(4), pp. 509-524, 1987.
TAGUCHI, G., "System of Experimental Design", Vol 1-2, Kraus International
Publications, New York, USA, 1987
TALAVAGE, J. e HANNAM, R.G., Flexible Manufacturing Systems in Pratice,Aplications,
Design and Simulation., Marcel Dekker Inc. New York, 1988.
TALAVAGE, J. e SHOLDHAN, R., "A combined AI-Simulation aproach for
designing manufacturing systems", Proceedings. of 1987 SAE Int. Congress,
Detroit, Feb, 1987.
VIALI, L., Simulação Aplicada a Manufatura Flexível,
Tese de Mestrado não publicada, Universidade Federal SC-CTC-EPS,
1991.
VINAYAGAMOORTHY, R. e MITAL, A. "Economic feasibility of a robot installation".
The Engineering Economist. Vol. 32, 3, 1987.
WAHAB, F.A.F.A., An expert system for the design os FMS's using simulation
analyses. Tese de Doutorado. University of Alabama, 1986.
WANG, H. , "An experimental analysis of the flexible manufacturing
system (FMS), in: A.Kuslak (ed.), Flexible Manufacturing Systems:
Methods and Studies. Norht-Holland, Amsterdam, 319-339, 1986.
WALTERMAN, D.A., A Guide to Expert Systems. Addison-Wesley Publishing Co..
1986
WHITNEY, A. e SURI, R., "Algorithm for parts and machines selection
in FMS", Annals of Operations. Research, 3, 95-117, 1985.
WICK, C.., "Advances in Machining Centers", Manufacturing Engineering,
Oct.,24-32, 1987.
WILHELM et alii., "Flexible Manufacturing Systems: A Review of Modeling
Approches for Desing, Justification and Operation, M: A.Kusiak (ed.), Flexible
Manufacturing Systems: Methods and Studies. North-Holland, Amsterdam, 0325,
1986.
WILHELM, W. E. e SHIN, H., "Effectiveness of alternate operations in
a Flexible Manufacturing System, International Journal of Production Research,
23, 65-79, 1985.
WINSTON, P.H., Artificial Intelligence, Reading, Mass.: Addison Wesley,
1984.
WU, S.Y.D., WYSK, R.A., "An aplication of discret event simulation
to on-1-me control and scheduling in flexible manufacturing", International
Journal of Production Research, 27, 1603-1623, 1989.
YIM, D. S. e LINN, R. J., "Push and pull rules for dispatching AGV's
in a FMS", International Journal of Production Research, 31, 43-57,
1993.
ZEESTRATEM, M.J., "The look ahead dispaching procedure", International
Journal of Production Research, 28, 369-384, 1990.
ZELENOVIC, D.M., "Flexibility, a condition for effective production
systems International Journal of Production Research., V 20, 3, 319-337,
1982
ZISK, B. I., " Flexibility is a Key to Automated Material Transport
System for Manufacturing Cells", Industrial Engineering, Nov., 52-60,
1983.
ZHUANG, L. e HINDI, K. S. "Approximate decomposition for closed queueing
network models of FMS with block-and-wait and state-dependent routing mechanism",
European Journal of Operational Research, 67, 3, 373-387, 1993.